Minto

Energized date: 8/19/1971 Current Population: 155 Number of Consumers: 100 Total Generating Capacity: 654 kw Max Fuel Capacity: 40,000 gallons

Kivalina (kiv-uh-LEE-nuh)

Energized date: 8/08/1971 Current Population: 423 Number of Consumers: 125 Total Generating Capacity: 842 kw Max Fuel Capacity: 131,000 gallons

Kaltag

Energized date: 11/23/1972 Current Population: 155 Number of Consumers: 98 Total Generating Capacity: 845 kw Diesel- 835 kw; Solar- 10 kw Max Fuel Capacity: 113,000 gallons

Huslia (HOOS-lee-uh)

Energized date: 11/22/1969 Current Population: 293 Number of Consumers: 149 Total Generating Capacity: 851 kw Max Fuel Capacity: 118,000 gallons

Goodnews Bay

Energized date: 12/02/1971 Current Population: 277 Number of Consumers: 98 Total Generating Capacity: 722 kw Max Fuel Capacity: 91,000 gallons

Anvik (AN-vick)

Energized date: 11/06/1970 Current Population: 79 Number of Consumers: 63 Total Generating Capacity: 600 kw Max Fuel Capacity: 78,141 gallons

Grayling Power Plant Upgrades

AVEC with the funding of Denali Commission and Alaska Energy Authority have been investing in various upgrades that will improve plant efficiency enabling future integration of renewable energy.  The existing manual single-phase three-in-one panel controls are being replaced with automated…

Shaktoolik Battery System Upgrade

AVEC  is currently negotiating grant funding from the Department of Energy Office of Indian Energy to upgrade the battery system.  This will directly benefit the Tribe and significantly improve the existing system by more efficiently measuring fuel.  Energy storage will…